Share

Permeable paving or concrete

HSTW
Initial Cost Premium: 
$$
Applicable to Rehab, New Construction, or Both: 
Both
Difficulty: 
Moderate
Maintenance Considerations: 
Varies with technology, low to moderate.
Opportunities to Offset Initial Cost Premium : 
Reduced design/build cost of engineered curb and gutter drainage systems

Copyright 2011 Chicago Community Loan Fund