Benefits: Leading Examples

Constitutes a tangible green feature that can generate discussion or buzz. The following sustainable strategies result in this benefit.

Building integrated wind turbine

ET
Initial Cost Premium: 
$$$
Applicable to Rehab, New Construction, or Both: 
Both
Difficulty: 
Difficult
Maintenance Considerations: 
Moderate routine/preventive maintenance.
Opportunities to Offset Initial Cost Premium : 
IL DCEO grants and loans

Construction and demolition waste recycling

EMT
Initial Cost Premium: 
0
Applicable to Rehab, New Construction, or Both: 
Both
Difficulty: 
Moderate
Maintenance Considerations: 
Low maintenance.
Opportunities to Offset Initial Cost Premium : 
Potential income source

FSC certified wood

MT
Initial Cost Premium: 
$$
Applicable to Rehab, New Construction, or Both: 
Both
Difficulty: 
Easy
Maintenance Considerations: 
Same as conventional.

Good Design Features

NT
Initial Cost Premium: 
$$$
Applicable to Rehab, New Construction, or Both: 
Both
Difficulty: 
Easy-Difficult
Maintenance Considerations: 
Varies
Opportunities to Offset Initial Cost Premium : 
Design Awards and Recognition

Integrated design process

EHILMNPSTW
Initial Cost Premium: 
0-$
Applicable to Rehab, New Construction, or Both: 
Both
Difficulty: 
Moderate
Maintenance Considerations: 
Should result in a better system design and easier maintenance.
Opportunities to Offset Initial Cost Premium : 
Green Communities planning grant

Native landscaping

HSTW
Initial Cost Premium: 
0-$
Applicable to Rehab, New Construction, or Both: 
Both
Difficulty: 
Easy
Maintenance Considerations: 
Low maintenance.

Occupant recycling

EMT
Initial Cost Premium: 
0
Applicable to Rehab, New Construction, or Both: 
Both
Difficulty: 
Moderate
Maintenance Considerations: 
Low maintenance.

Permeable paving or concrete

HSTW
Initial Cost Premium: 
$$
Applicable to Rehab, New Construction, or Both: 
Both
Difficulty: 
Moderate
Maintenance Considerations: 
Varies with technology, low to moderate.
Opportunities to Offset Initial Cost Premium : 
Reduced design/build cost of engineered curb and gutter drainage systems

Rainwater harvesting

STW
Initial Cost Premium: 
$-$$
Applicable to Rehab, New Construction, or Both: 
Both
Difficulty: 
Moderate
Maintenance Considerations: 
Moderate routine/preventive maintenance.

Rapidly renewable materials

MT
Initial Cost Premium: 
$$
Applicable to Rehab, New Construction, or Both: 
Both
Difficulty: 
Easy
Maintenance Considerations: 
Varies, typically same as conventional

Recycled-content products (postconsumer or postindustrial)

EMT
Initial Cost Premium: 
$-$$
Applicable to Rehab, New Construction, or Both: 
Both
Difficulty: 
Easy
Maintenance Considerations: 
Same as conventional.

Salvaged materials

EMT
Initial Cost Premium: 
0-$
Applicable to Rehab, New Construction, or Both: 
Both
Difficulty: 
Moderate
Maintenance Considerations: 
Same as conventional.
Opportunities to Offset Initial Cost Premium : 
Potential income source

Solar Thermal Hot Water Heating

ET
Initial Cost Premium: 
$-$$
Applicable to Rehab, New Construction, or Both: 
Both
Difficulty: 
Moderate
Maintenance Considerations: 
Moderate routine/preventive maintenance.
Opportunities to Offset Initial Cost Premium : 
Federal and IL tax incentives; IL DCEO grants and loans

Vegetative roof

HSTW
Initial Cost Premium: 
$$$
Applicable to Rehab, New Construction, or Both: 
Both
Difficulty: 
Moderate for new construction; difficult for Rehab
Maintenance Considerations: 
Routine inspection and maintenance; minimal for extensive roofs, moderate for intensive roofs.